Last weekend The Princess and I moved furniture.
What was the dining room is now the sitting room.
The dining room window is now french doors.
Friday night my brother and I met JB at the door store. We picked out doors and hardware and asked them to rush our job through. They nicely agreed. As soon as we got home the boys got busy taking the window out.
First the drywall was cut and removed, revealing electricity running under the window.
Holes were drilled in the floor and the electricity was rerouted.
The siding was removed from the outside of the house.
The window was loosened. Insulation pulled out. Big messes were made.
The dogs got into the act. They really weren't sure what the big hole in the house was.
The the remaining wall was removed. It has taken up residence on the deck.
The boys went to pick up the doors and the frame was installed.
Finally the first door went in.
The second door was hung and all the hardware installed (see the construction mess on the deck?).
Finally there are the doors. They still need the interior trim installed, but that's been purchased and should be done tomorrow. The brick moulding outside is already in place. Brother heads home tomorrow, but JB has Monday off so hopefully there will be more deck progress soon - it's almost done.